00359 29924097
00359 879888082
info@greentechsod.bg
Sofia, 1415, 36 Okolovrasten pat Str., floor 2, Bulgaria
ENGLISHBulgarian

QEMAL STAFA STADIUM

The Albanian Football Federation once again chose Greentech Sod to provide ready-made turf for the construction of the Qemal Stafa.
The specifications of the project as well as the turf were very demanding because it is the central stage of the capital of the country, which would be used by the national team of Albania for its official matches. That's why the "Olympico" variety was selected, a variety of highly durable and suitable for the microclimate of the area.
 Greentech Sod with its excellent mechanical equipment has successfully completed the 8,000m2 layout of the turf on the field with the Big slab method (turf rolls 1m x 42m).
More Photos >
00359 29924097
00359 879888082
info@greentechsod.bg
Sofia, 1415, 36 Okolovrasten pat Str., floor 2, Bulgaria
© 2024 GreenTech Sod. All rights reserved.